IndoJack — Daily Ops Dashboard

Morning meeting + EOD report in one page · Pilot Batch 1 launches Fri May 29, 2026
Today: Monday · May 25, 2026
Last refresh: 2026-05-25 · 19:00 WIB · post-meeting
Next refresh: Tue May 26 · 17:00 WIB (auto)
How to use this page: Morning meeting → read sections 1 + 2. Evening report → read sections 3 + 4. Deadlines + timeline always visible below. Sabina rewrites this file each evening (~17:00 WIB) so opening it the next morning shows the latest plan.
Launch countdown
T-4 days
Target launch Fri, May 29, 2026 · launch approved by Nick — ads go live even without US product; priority is speed + real data
Closed today
8
DUNS · Meta Pixel · 6 ads final · restructure Step 1 · tier images · email-list plan · May 29 brief · Nick 5 PM meeting
Decisions locked
6
Tier price · sizes · ad set · launch model · 2-option ad format · no price in ads — all confirmed at the 5 PM meeting
Open blockers
2
Cofea slow — chase Kathya, keep backups warm · box design blocked on Cofea's ingredient list

1. Today's Plan MORNING MEETING

What was set for today. Owner, status as of end of day.

Targets for today PLAN

Launch week opens · heavy execution day · 6 work items — all closed
#TargetOwnerStatus
1DUNS — receive / log the number; write the FDA Registration Action PlanNick / GabriellaDone
2Re-install Meta Pixel on the Squarespace store + verify it firesGabriellaDone
3Finalise the 6 hero ads — artwork + CTA bar; remove Ad #1 price tagsGabriellaDone
4"The Drop / Stockpile" pivot — rewrite 6 ad copies; landing-page spec + build planGabriellaDone
5Website restructure Step 1 — hide old products, clear demo items, remove false claimGabriellaDone
6Tier product images + email-list build plan + May 29 launch decision briefGabriellaDone

Awaiting replies WAITING

Cofea is the live risk · a backup-vendor pipeline is being kept warm
WhoTopicStatus
CofeaProduction quotation · capsule details · FDA facility data · ingredient listSlow — chase Kathya
Backup vendorsExpat Roasters (strong option) · Otten Coffee · Expresso Indonesia — keep warmOn standby
Co-packer quotesJoe's Garage · Buy K-Cups · Assemblies Unlimited (assembly-only)Pipeline ongoing
Customs broker quotesOEC · C.H. Robinson · A.N. Deringer · RoanokePipeline ongoing

2. Decisions Pending Nick ASK

The 5 PM meeting cleared almost everything. One sign-off remains before the ads can go up.
1. Final ad sign-off before the Meta upload
The 6 redesigned static ads are approved. The hero video is still being finished and will be shown to Nick tomorrow. Once Nick gives the all-clear on the full set (6 statics + video), Gabriella uploads the ads to Meta on Tue May 26. Nick also to confirm receipt of the 6 hero static images assigned to him.
Owner: Nick · Status: Sign-off → enables Meta upload
Locked at tonight's 5 PM meeting — no longer pending:
Standing direction:

3. Today's Progress EOD REPORT

What actually got done today, and tomorrow's plan.

Closed today DONE

Monday May 25 — a heavy execution day, capped by the 5 PM meeting
What got doneOutcome
Nick 5 PM meeting — 6 decisions locked (price, sizes, ad set, launch, ad format, no-price-in-ad)Done
DUNS number received — 120282607 logged; FDA Registration Action Plan writtenDone
Meta Pixel reconnected to Squarespace + verified firing liveDone
All 6 hero ads finalised — artwork + CTA bar; Ad #1 price tags removedDone
"The Drop" landing-page spec + build plan; restructure Step 1 (store cleaned, false claim removed)Done
3 tier product images · email-list build plan · May 29 launch decision briefDone

Tomorrow's plan TUE MAY 26

Launch week · T-3 to May 29 · ads go up tomorrow
WhenActivity
Tue May 26Build the 3 tier products on the #drops page — now unblocked ($1.20/pod, 2/4/6 boxes, keep a lifetime option)
Tue May 26Finish the hero video (humor-led) — show it to Nick
Tue May 26After Nick's final OK — upload the ads to Meta
Tue May 26Find a Meta ads preview / sandbox method (clickable, no real orders)
Tue May 26Chase Cofea — follow up Kathya; keep backup vendors warm (Expat Roasters)

Headline metrics today: T-4 to May 29 · 6 decisions locked at the 5 PM meeting · launch approved · DUNS received · Meta Pixel live · 6 hero ads approved · Cofea slow — chase Kathya, backups warm · Cost to date: $0.

4. This Week — Critical Path (May 25 → 31)

Mon-Sun strip. Past days shaded · today highlighted · color-coded by risk level.
Mon · today
25
DUNS received
Meta Pixel live
6 hero ads final
Nick 5 PM — 6 decisions locked
Tue
26
Build 3 tier products
Finish video → show Nick
Upload ads to Meta
Chase Cofea
Wed
27
Email list live
Meta preview sorted
Final QA pass
Thu
28
Final pre-launch checks
Fri
29
🚀 LAUNCH · Meta ads go live
Sat
30
Launch monitoring
Sun
31
Launch monitoring

Next Week — Post-Launch Monitoring (Jun 1 → 7)

Mon
1
Launch week-1 review
Tue
2
Wed
3
Thu
4
Ad performance mid-read
Fri
5
7-day clean ad read — pick the winners
Sat
6
Sun
7

5. All Upcoming Deadlines (sorted)

Every dated item across the project, earliest first. T-X column auto-updates each time the page is opened.
Due Countdown Item Owner Risk
Tue May 26Build the 3 tier products on the #drops page ($1.20/pod · 2/4/6 boxes · keep a lifetime option)GabriellaNormal
Tue May 26Finish the hero video (humor-led) and show it to NickSabinaDecision
Tue May 26Upload the ads to Meta — after Nick's final sign-offGabriella / NickDecision
Tue May 26Chase Cofea (Kathya) · keep backup vendors warm (Expat Roasters)SabinaCritical
Wed May 27Email list live (cartoon + video content) · Meta preview/sandbox method sortedGabriellaNormal
Thu May 28Final pre-launch checks — #drops page, ads, trackingGabriellaDecision
Fri May 29🚀 LAUNCH — Meta ads go live (DTC)AllLaunch
Fri Jul 2460-day revenue checkpoint ($11,000 Batch 1 pilot target) — Batch 2 go/no-goNickFuture
Tue Jul 2860-day window closesFuture
Cofea-gated — no date yet: production quotation, capsule details, FDA facility data, and the ingredient list (the ingredient list also blocks the retail box design). Cofea is slow; chase Kathya (per Erik, the most responsive contact) and keep the backup vendors warm as the mitigation.

6. Workstream rollup (reference)

Big-picture R/A/G of every workstream. For Nick's at-a-glance read; daily activity above.

On track / locked

  • 6 hero ads approved by Nick — "The Drop / Stockpile" redesign ("nice pivot, I love it")
  • Tier pricing locked — $1.20/pod (pod cost ~$0.36); margin not a Round-1 concern
  • Tier sizes locked — 2 / 4 / 6 boxes; lifetime / bulk option kept
  • Launch model approved — ads go live May 29; priority speed + real data
  • DUNS received — 120282607 · FDA Registration Action Plan written
  • Meta Pixel live on Squarespace — verified firing
  • Website restructure Step 1 done · tier product images ready
  • Squarespace store + payments + Cult subscription live · Meta Ad Account set
  • Capsule — Nespresso OriginalLine (aluminum) · co-packer scope assembly-only

In progress / next

  • Hero video — humor-led (neurotic man + butterfly net); finish + show Nick Tue May 26
  • Meta upload — Tue May 26, after Nick's final sign-off
  • Build the 3 tier products on the #drops page — now unblocked
  • Ad creative note — ads must present 2 options (10-pack OR subscribe); no price shown
  • Meta ads preview/sandbox method — find a clickable, no-real-order test
  • Email list — set up for cartoon + video content
  • Co-packer + customs broker quotes — pipeline ongoing

Critical / blocking

  • Cofea slow / unresponsive — owes the quotation, capsule details, FDA facility data and ingredient list · chase Kathya · backup pipeline kept warm (Expat Roasters, Otten, Expresso)
  • No product in the US — Nick accepts this; launching May 29 anyway to collect real data
  • Box design — blocked on Cofea's ingredient list (FDA label req) + "Vertuo" → "OriginalLine" fix